ethiopiantimes

November 4, 2013

Addis Ababa Road Authority takes over MIDROC’s 270mln Birr road project

Filed under: Uncategorized — ethiopiantimes @ 6:28 pm
Tags: , , , , ,

AARA takes over MIDROC’s 270mln Birr road project

Addis Ababa Road Authority takes over MIDROC’s 270mln Birr road project. This project was snatched from MIDROC Ethiopia Construction, after it failed to execute the work on schedule.

The contract that was signed between MIDROC and Addis Ababa’s Road Authority was for the construction of the 8.3 Kilometers long road that stretches from Gurd Shola area of the city, through Yeka, Summit and The Yeka – Bole road. Though the project that was started six years ago, on 2000 E.C, was planned to be completed two years later on 2002 E.C; the project has not yet been completed now, three years later.

Addis Ababa’s road Authority had issued persistent warning letters to MIDROC. Even though the Authority had decided to terminate the project years ago, it was only now that it has resolved to snatch the road project off from MIDROC.

Advertisements

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: